Our Projects

Review our portfolio of civil works, cold storage plants, industrial electronics and automation systems, and high-precision digital and drone surveying and mapping across Saudi Arabia.

Construction Steel Structure Facility
Jubail Industrial City

Pre-Engineered Steel Structure Facility

Design, fabrication, and assembly of a 12,000 sqm warehouse and assembly floor with high-load girders.

View Case Study
Cold Storage Port Cold Storage Complex
Jeddah Islamic Port

Jeddah Port Cold Storage Complex

Commissioning of a massive 500-ton capacity cold room unit utilizing low-GWP refrigerant R-448A.

View Case Study
Automation Water Desalination Automation
Yanbu Desalination Plant

Water Distribution VFD Panel Systems

Engineering, assembly, and SCADA programming of critical VFD panels for main pumping networks.

View Case Study
Digital Surveying Drone mapping
Qiddiya Development

Drone Boundary & Topographic Mappings

High-resolution drone mapping covering 400 hectares, creating DEM overlays and boundary layouts.

View Case Study
Trading & Logistics Steel supplies shipment
Dammam & Riyadh Ports

Bulk ASTM Structural Steel Supply

Procuring and supplying 8,000 tons of structural H-beams for Saudi residential and metro sectors.

View Case Study

A Closer Look: Detailed Project Run

Review a representative case study showcasing our complete integrated design-to-commissioning workflow.

12,000 sqm Pre-Engineered Steel Facility

The Challenge:

Our client required a massive pre-engineered manufacturing facility with heavy 20-ton crane girders, high thermal insulation, and integrated MCC panels within a strict 8-month timeline. The location was subject to high saline marine corrosion (less than 2km from Jubail coastline).

The Nexa Solution:

We deployed an integrated group strategy:
• Our Surveying team laid out millimeter-accurate reference markers.
Construction fabricated ASTM A572 Grade 50 columns with thick hot-dip galvanization coatings to shield against coastline salt corrosion.
Cold Storage manufactured and sealed 100mm PUF wall panels to optimize air conditioning load.
Electronics assembled and commissioned the main MCC cabinets with VFD pumps to support the plant's automated cooling systems.

The Result:

The facility was handed over 12 days ahead of schedule with a 100% safety record. Energy monitoring reports indicate a 28% decrease in HVAC operational overhead due to the tight thermal seal of the sandwich panels.

Project Details

  • Client Arabian Petrochemicals Corp.
  • Completion Date January 2026
  • Location Jubail, KSA
  • Venture Sectors Construction, Cold Room, Automation
  • Compliance Aramco Safety Approved